- News
- Parking
- Innovation
Some advantages of the new system:
- Fast and low temperature curing (open to traffic after 48 hours)
- Manual processing
- Highest wear resistance
- 0% plasticizer
- 90% sand reduction
- Short installation times
- No rashes
- Environmental friendly due to renewable raw materials
- CO2 reduction
- Certified accord. to DIN EN 1504-2 and DIN V18026, RILI SIB 2001, class OS10
- Increased dynamic crack bridging class B4.2 at −20 ° C