Parking area- finished surface
The architect‘s office Schöppel, Munich was assigned with the planning of the refurbishment. Due to the current building condition no larger surface repair works had been necessary. Therefore a substrate preparation with a vacuum shot blasting machine was sufficient. The existing coating around the pillars originally only should have been grinded and over-coated. During the work it was stated that the adhesion of the old coating partly was insufficient. As a result this was removed likewise and revised. To the execution the VIASOLDECK 11b plus was applied.